首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高速铁路接触网附加导线转换方案研究
作者单位:;1.沈阳铁路局供电处;2.铁道第三勘察设计院集团有限公司
摘    要:接触网附加导线虽不与受电弓直接发生接触,但其状态与行车安全密切相关。在我国高速铁路建设初期,附加导线在转换处设计考虑不够全面,产生了不少问题。结合目前高速铁路的常规隧道断面和车站布置方案,研究适用于不同线路条件下的附加导线转换方案,保证附加导线和接触悬挂、附加导线和建筑物之间的绝缘距离,加强接触网系统的安全可靠性,同时满足技术经济性和景观性要求。研究结论:结合标准规范和工程实际,对附加导线转换处的设计方案进行方案比选,从绝缘距离、安装施工难度、建设成本、景观性等诸多方面对设计方案进行剖析,最后根据比选结果给出不同情况下的推荐方案。

关 键 词:高速铁路  接触网  接触悬挂  附加导线  隧道

Approach to the Conversion of OCS Additive Wire on High-speed Railway
Institution:,Department for Power Supply,Shenyang Railway Administration Bureau,The Third Railway Survey and Design Institute Group Corporation
Abstract:Research purposes and methods: Although the additive wire of OCS doesn't contact with pantograph directly,its performances are closely related to traffic safety. In the early construction of highspeed railway in China,the design of the additive wire at converting point didn't take into account all related issues and resulted in many problems. The paper,with reference to the design of additive wire conversion on different high speed lines with conventional tunnel profile and station layout,looks for the design suitable for lines with different conditions to guarantee the insulation distances between the additive wire and catenary,between the additive wire and buildings and to meet the requirements for economy and landscape at the same time. Research conclusions: with reference to standards,specifications and engineering practices,the paper conducts comparison of conversion designs of additive wire,and analysis of the design in many respects,such as the insulation distances,the difficulties in installation and construction,capital costs and landscape. Finally,depending on the comparison results,the paper offers recommended plans for different circumstances and provides references for future design and construction.
Keywords:High-speed railway OCS  Catenary  Additive wire  Tunnel
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号