基于NSGA2遗传算法的地铁隧道上方基坑工程优化设计
引用本文:卜康正,赵勇,郑先昌.基于NSGA2遗传算法的地铁隧道上方基坑工程优化设计[J].铁道科学与工程学报,2021,18(2):459-467.
作者姓名:卜康正  赵勇  郑先昌
作者单位:深圳市水务规划设计院股份有限公司,广东深圳 518000;中铁南方投资集团有限公司,广东深圳 518052;广州大学土木工程学院,广东广州 510006
基金项目:中国中铁股份有限公司科技开发计划重点课题
摘    要:为在有效控制基坑下覆地铁隧道竖向位移的情况下,尽可能地减小基坑工程造价,基于NSGA2遗传算法,以5个基坑工程控制下覆地铁隧道竖向位移的关键设计参数为优化设计变量、隧道最大竖向位移和工程造价中的可变值为优化目标,优化得到Pareto最优解集。结合专家打分-COWA算子-博弈论组合赋权法和TOPSIS法从Pareto最优解集中选出最佳方案,并分析专家打分的主观权重改变对最佳方案的设计变量、目标函数值等参数的影响。研究结果表明:最佳方案比初始方案的隧道最大竖向位移减少23.3%,工程造价中的可变值减少36.9%,证明本文对地铁隧道上方基坑工程优化设计方法的有效性。

关 键 词:基坑工程  地铁隧道  竖向位移  工程造价  优化设计  NSGA2遗传算法

Optimization design for foundation pit above metro tunnel based on NSGA2 genetic algorithm
BU Kangzheng,ZHAO Yong,ZHENG Xianchang.Optimization design for foundation pit above metro tunnel based on NSGA2 genetic algorithm[J].Journal of Railway Science and Engineering,2021,18(2):459-467.
Authors:BU Kangzheng  ZHAO Yong  ZHENG Xianchang
Institution:(Shenzhen Water Planning and Design Institute Co.,Ltd.,Shenzhen 518000,China;Sino-Railway South Constructing Group Co.,Ltd.,Shenzhen 518052,China;School of Civil Engineering,Guangzhou University,Guangzhou 510006,China)
Abstract:To effectively control the vertical displacement of the metro tunnel under the foundation pit and reduce the construction cost of the foundation pit as much as possible,based on NSGA2 genetic algorithm,the Pareto optimal solution set was obtained by taking 5 key design parameters of the foundation pit controlling the vertical displacement of the underlying metro tunnel as the optimal design variables,the maximum vertical displacement of the tunnel and the variable value of construction cost as the optimization objectives.Combining the expert scoring-COWA operator-game theory combination weighting method and TOPSIS method,the optimal scheme was selected from Pareto optimal solution set,and the effect on the change of the subjective weight of expert scoring on the design variables,objective function values and some other parameters of the best scheme were analyzed.The results show that the maximum vertical displacement of the tunnel in the best scheme is 23.3%less than that in the initial scheme,and the variable value of construction cost is 36.9%less than that in the initial scheme.It proves the effectiveness of the optimization design method for the foundation pit above the metro tunnel.
Keywords:foundation pit  metro tunnel  vertical displacement  construction cost  optimization design  NSGA2 genetic algorithm