首页 | 本学科首页   官方微博 | 高级检索  
     检索      

仑-大区间隧道过河段盾构掘进难点及措施
引用本文:王成,姚明会,柴永模.仑-大区间隧道过河段盾构掘进难点及措施[J].现代隧道技术,2006,43(3):35-41.
作者姓名:王成  姚明会  柴永模
作者单位:中铁十三局集团有限公司,长春,130300
摘    要:文章以广州市轨道交通四号线大学城专线中,仑头至大学城区间右线隧道为例,介绍盾构机过仑头海掘进和在江底被困情况,阐述盾构机过河段掘进难点及处理措施,可供类似工程借鉴。

关 键 词:区间隧道  盾构掘进  难点  措施
文章编号:1009-6582(2006)03-0035-07

Difficulties encountered and countermeasures adopted on river-crossing section for a shield driving from Luntou to Daxuecheng
Wang Cheng,Yao Minghui,Chai Yongmo.Difficulties encountered and countermeasures adopted on river-crossing section for a shield driving from Luntou to Daxuecheng[J].Modern Tunnelling Technology,2006,43(3):35-41.
Authors:Wang Cheng  Yao Minghui  Chai Yongmo
Abstract:The paper introduces the situation of a shield trapped at the bottom of a river near Luntou while the shield was boring the right line transit tunnel from Luntou to Daxuecheng on line 4 of Guangzhu Urban Rail Transit.Difficulties encountered and countermeasures adopted are described which can be taken for reference by similar projects.
Keywords:Running Tunnel  Shield driving  Difficulties  Countermeasures  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号