首页 | 本学科首页   官方微博 | 高级检索  
     检索      

钻孔灌注桩施工工艺及施工过程的主要控制因素
引用本文:董万军.钻孔灌注桩施工工艺及施工过程的主要控制因素[J].交通标准化,2010(17):175-177.
作者姓名:董万军
作者单位:甘肃省交通服务公司,甘肃,兰州,730020
摘    要:根据工程实例分析钻孔灌注桩施工的工艺流程,在介绍各施工环节的同时,着重指出重要的控制因素,以在施工过程中使桩基质量得到保证,进而确保桥梁质量及寿命。

关 键 词:钻孔灌注桩  施工工艺  控制因素

Construction Technique and Main Control Factors of Cast-in Place Bored Pile
DONG Wan-jun.Construction Technique and Main Control Factors of Cast-in Place Bored Pile[J].Communications Standardization,2010(17):175-177.
Authors:DONG Wan-jun
Institution:DONG Wan-jun (Communication Service Company of Gansu Province,Lanzhou 730020,China)
Abstract:According to practical engineering,the technical procedure of bored pile construction is analyzed.Every construction link is introduced,meanwhile some important control factors are pointed out especially,so as to ensure the quality of pile foundation in construction.It has positive significance to ensuring the quality and service life of bridge.
Keywords:bored pile  construction technique  control factor
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号