某地铁工程盾构刀盘改造力学分析
引用本文:吴遁,黎虎,刘玉江,陈阵.某地铁工程盾构刀盘改造力学分析[J].隧道建设,2017,37(10):1328-1333.
作者姓名:吴遁  黎虎  刘玉江  陈阵
作者单位:(中铁十四局集团隧道分公司, 山东 济南 050061)
摘    要:为了适应富水中砂地层盾构掘进,需要对原有刀盘结构进行改造,并研究改造前后的刀盘力学特性。采用理论计算土压平衡和土压不平衡2种工况下的刀盘外载,并利用有限元法分析改造前后盾构刀盘的应力及变形情况。研究结果表明:1)土压不平衡工况下的最大等效应力和最大变形高于土压平衡工况。2)对于同一种工况,改造前后刀盘的最大等效应力变化不大,但最大变形量增加了10%左右;最大等效应力位于刀盘背板与牛腿的连接处,最大变形发生在刀盘左下侧及右上侧的边缘位置。改造后刀盘的强度和刚度均满足施工要求,实际掘进效果良好,掘进效率明显提升。

关 键 词:富水中砂地层  盾构  刀盘改造  静力分析  应力  变形
收稿时间:2017-03-16

Mechanical Analysis of Shield Cutterhead Modification for a Metro Project
WU Dun,LI Hu,LIU Yujiang,CHEN Zhen.Mechanical Analysis of Shield Cutterhead Modification for a Metro Project[J].Tunnel Construction,2017,37(10):1328-1333.
Authors:WU Dun  LI Hu  LIU Yujiang  CHEN Zhen
Institution:(Tunnel Branch of China Railway 14th Bureau Group Co., Ltd., Jinan 050061, Shandong, China)
Abstract:The original structure of the cutterhead needs to be improved; and the mechanical properties of the cutterhead need to be analyzed before and after modification so as to realize shield tunneling in medium sand stratum with rich water. The theoretical calculation of the cutterhead load under conditions of earth pressure balance and unbalance is implemented; and then the finite element method is used to study the stress and deformation of shield cutterhead before and after modification. The study results show that: 1)The maximum equivalent stress and the maximum deformation of the cutterhead under condition of earth pressure unbalance are higher than that under condition of earth pressure balance. 2)For the same condition, the maximum equivalent stress of cutterhead varies little before and after modification; while the maximum deformation increased by about 10%; the maximum equivalent stress is located in the cutter plate and the bracket; and the maximum deformation is located in the bottom left edge and the above right edge of the cutterhead. After modification, the strength and rigidity of the cutterhead can meet the construction requirements; and it has good tunneling effect and efficiency.
Keywords:medium sand stratum with rich water  shield  cutterhead modification  static analysis  stress  deformation