Scientific and Technological Innovation and Operation related Issues for Island Tunnel of Hong Kong Zhuhai Macao Fixed Link Project(港珠澳大桥岛隧工程建设的科技创新和 运营后应关注的若干问题)
作者姓名:SUN  Jun
作者单位:(Tongji University, Shanghai 200092, China)
摘    要:The author explains why a giant undersea immersed tube tunnel was selected for the sea area of the main channel of the east side of the Hong Kong Zhuhai Macao Fixed Link Project, instead of employing a bridge or shield tunnel; and summarizes several domestic and international leading innovative technologies applied in the island tunnel construction of the Hong Kong Zhuhai Macao Fixed Link Project, including the use of huge self stabilized steel cylinders as retaining structure of foundation pits for constructing the artificial islands, the large area and ultra deep "sand compaction pile (SCP) composite foundation" reinforcement technology, "semi rigid segment joints", "sandwich" steel RC combined inverted trapezoid closure joints, and crack control and anti corrosion/durability design for RC tube structure. All these technologies reflect Chinese wisdom and Chinese speed. The author also points out some technical issues to which attention should be paid after the immersed tube tunnel of the project is put into operation: (1) Will the post construction settlement and differential settlement of the immersed tube tunnel further develop after the project is open to traffic? How much is the final convergence value? If it exceeds the limit, what control measures should be taken?(2) How to deal with the issue that the joints of large/small elements or segments are open? How to ensure that all the large and small joints between segments of the tube are "watertight"? Furthermore, the author presents some suggestions and control measures: (1) For excessive post construction settlement (especially differential settlement) spotted on large joints, it is suggested to incorporate "micro disturbance grouting" for post treatment. (2) If a joint opens under the excessive positive bending moment at the floor slab, it is believed that the open joint on the floor slab can be closed again by cutting off some prestressed tendons in the roof slab of the segment to reduce the positive bending moment of the section.

关 键 词:Hong  Kong  Zhuhai  Macao  Fixed  Link  Project  immersed  tube  tunnel  island  tunnel  works  huge  self  stabilized  steel  cylinder  retaining  structure  "8  hammer  synchronous  vibration  sinking"  technology  "SCP  composite  foundation"  technology  semi  rigid  segment  joints  steel  RC  combined  inverted  trapezoid  closure  joints  concrete  crack  control  anti  corrosion/durability  design  post  construction  settlement  differential  settlement  joint  leakage  and  treatment  
收稿时间:2018-08-02
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号