"预沉降法"的可行性分析
引用本文:李玲,梁怿如."预沉降法"的可行性分析[J].铁道工程学报,2007(Z1).
作者姓名:李玲  梁怿如
作者单位:中铁工程机械研究设计院有限公司,武汉,430066
摘    要:研究目的:针对客运专线无砟轨道路基沉降控制工程面临的新问题,探讨“预沉降法“的可行性。研究结果:该工法可减少工后沉降和不均匀沉降,满足无砟轨道铁路路基沉降变形控制的要求,且可达到过渡段路基工后“零沉降“的目标。

关 键 词:无砟轨道  路基  零沉降  预沉降法  大直径现浇混凝土薄壁筒桩  高频液压振动锤

The Feasibility Analysis of "A Method of Prepare to Decline"
LI Ling,LIANG Yi-ru.The Feasibility Analysis of "A Method of Prepare to Decline"[J].Journal of Railway Engineering Society,2007(Z1).
Authors:LI Ling  LIANG Yi-ru
Abstract:Research purposes:Aiming at the new problem of passenger dedicated railway ballastless track roadbed decline control project,this paper explored the feasibility of "a method of prepare to decline" Research results:The new method can reduce the post-construction settlement and the foundation asymmetry to decline,satisfy the request of both passenger dedicated railway ballastless track roadbed decline control project and "zero post-construction settlement" at transition zone between roadbed and bridge.
Keywords:ballastless track  roadbed  zero post-construction settlement  a method of prepare to decline  shell tubular pile of large-diameter placing-in-situ concrete  high frequency hydraulic pressure vibrated hammer