首页 | 本学科首页   官方微博 | 高级检索  
     检索      

合蚌客专350km/h单线试验箱梁工艺试验研究
引用本文:郭晓明.合蚌客专350km/h单线试验箱梁工艺试验研究[J].铁道建筑技术,2012(10):56-59.
作者姓名:郭晓明
作者单位:中国铁建十九局集团有限公司专题,北京,100176
摘    要:时速350公里客运专线单线后张法单箱单室预应力混凝土简支箱梁属首次应用。为验证其各项指标,进行了4孔箱梁的试验工作;通过对箱梁的各项工艺试验进行研究,充分验证箱梁的设计。

关 键 词:客运专线  单线箱梁  工艺试验

Study on Process Test for Box Girder of Hefei-Bengbu Dedicated Passenger Railway 350 km/h Single-Track Line
Guo Xiaoming.Study on Process Test for Box Girder of Hefei-Bengbu Dedicated Passenger Railway 350 km/h Single-Track Line[J].Railway Construction Technology,2012(10):56-59.
Authors:Guo Xiaoming
Institution:Guo Xiaoming(China Railway 19th Bureau Group Co.Ltd.,Beijing 100176,China)
Abstract:The post-tensioning method single-cell pre-stressed concrete simple box girder for 350 km/h dedicated passenger railway single-track line is used for the first time.To verify its performance indexes,four-truss box girder test is carried out,studies on box girder process tests fully verify the design of box girder.
Keywords:passenger dedicated railway  single track box girder  process test
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号