首页 | 本学科首页   官方微博 | 高级检索  
     检索      

钢筋砼电缆沟和场桥跑道梁施工模板改进措施
引用本文:杨勇.钢筋砼电缆沟和场桥跑道梁施工模板改进措施[J].水运工程,2007(Z1).
作者姓名:杨勇
作者单位:营口港工程监理咨询有限公司 辽宁营口
摘    要:在营口港四期集装箱堆场内的钢筋混凝土电缆沟和场桥跑道梁施工中,对模板支架进行了改进,保证了砼外观质量。

关 键 词:混凝土  模板  改进  质量

Mould Improvement During Construction of R.C.Cable Duct and RTG's Runway Beam
YANG Yong.Mould Improvement During Construction of R.C.Cable Duct and RTG's Runway Beam[J].Port & Waterway Engineering,2007(Z1).
Authors:YANG Yong
Abstract:During construction of R.C.cable duct and RTG'srunway beam of Yingkou Port Phase IV container stacking yard,improvement measures were taken for the mould supports,by which concrete's exterior looking was guaranteed.
Keywords:concrete  mould  improvement  quality
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号