首页 | 本学科首页   官方微博 | 高级检索  
     

三峡坝上待闸锚地建设规模探讨
引用本文:张 毅,解中柱,朱俊风. 三峡坝上待闸锚地建设规模探讨[J]. 水运工程, 2013, 0(3): 148-152
作者姓名:张 毅  解中柱  朱俊风
作者单位:长江重庆航运工程勘察设计院,重庆 401147;长江重庆航运工程勘察设计院,重庆 401147;长江重庆航运工程勘察设计院,重庆 401147
摘    要:受恶劣天气、汛期大流量、船闸停航检修等因素影响,三峡坝上大量船舶积压,待闸锚地锚位数量严重不足。利用排队论相关理论,建立待闸锚地排队模型,并结合过闸船舶的统计资料对现有锚地规模进行分析评价,可为三峡待闸锚地的建设规模提供参考。

关 键 词:锚地;排队论;待闸锚地排队模型;锚地规模

On scale of anchorage in front of Three Gorges dam
ZHANG Yi,XIE Zhong-zhu and ZHU Jun-feng. On scale of anchorage in front of Three Gorges dam[J]. Port & Waterway Engineering, 2013, 0(3): 148-152
Authors:ZHANG Yi  XIE Zhong-zhu  ZHU Jun-feng
Affiliation:Changjiang Chongqing Harbour and Waterway Engineering Investigation and Design Institute, Chongqing 401147, China;Changjiang Chongqing Harbour and Waterway Engineering Investigation and Design Institute, Chongqing 401147, China;Changjiang Chongqing Harbour and Waterway Engineering Investigation and Design Institute, Chongqing 401147, China
Abstract:Due to the bad weather, large flow in flood season, and maintenance of lock, a large number of ships wait lockage at the Three Gorges dam, and the berth of anchorage faces a serious shortage. This paperestablishes queuing models of anchorage by the queuing theory to evaluate the scale of anchorage on the basis of statistics, which provides a reasonable basis for the study on the construction scale of the anchorage of the Three Gorges.
Keywords:anchorage ground   queuing theory   queuing models of anchorage   scale of anchorage
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号