首页 | 本学科首页   官方微博 | 高级检索  
     检索      

发展重载运输对编组站既有调速设备提出的新要求
引用本文:吕佰铨.发展重载运输对编组站既有调速设备提出的新要求[J].减速顶与调速技术,2005(3):5-7.
作者姓名:吕佰铨
作者单位:[1]哈尔滨铁路局减速顶调速系统研究所,黑龙江 哈尔滨 150006
摘    要:文章介绍了发展重载运输以后对编组站作业带来的各种影响,并提出应对既有的调速设备和作业方式进行改造和改进来适应这一新变化.

关 键 词:编组站  重载  调速  停车  减速顶  停车顶
收稿时间:06 7 2005 12:00AM
修稿时间:2005年6月7日

The New Demand in Existence Speed Control Equipments in Marshalling Station After Development the Over Loading Transportation
LU Bai-quan.The New Demand in Existence Speed Control Equipments in Marshalling Station After Development the Over Loading Transportation[J].Retarders & Speed Control Technology,2005(3):5-7.
Authors:LU Bai-quan
Abstract:This Article imrcduces to bring the multifarious influence in marshalling station busywork after development the over loading transportation,and it also put forward that we should adapt this new change to alteration and amelioration the existence speed control equipments and operation mode.
Keywords:marshalling  station  over loading  controh stop car  retarder arrest
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号