首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于指定到达追踪间隔的高铁车站接车进路长度研究
引用本文:党杨瑞,陈韬,张杰,夏昭辉.基于指定到达追踪间隔的高铁车站接车进路长度研究[J].综合运输,2021(2):84-88.
作者姓名:党杨瑞  陈韬  张杰  夏昭辉
作者单位:西南交通大学;西南交通大学;综合交通运输智能化国家地方联合工程实验室;中铁第一勘察设计院集团有限公司线路运输院
基金项目:国家自然基金项目(61703351);中国铁路总公司科技研究开发计划课题(K2018X014)。
摘    要:确定合理的高铁车站接车进路长度对压缩到达追踪间隔时间有重要意义。本文首先通过构建满足到达追踪间隔时间的高铁车站接车进路长度计算模型,提出了接车进路长度的主要影响因素为由线路限制速度、站前坡坡度、制动力使用系数三因素(简称三因素)所确定的车载设备监控制动距离内列车运行时间。然后,通过对常见的线路限制速度、站前坡坡度、制动力使用系数取值下的车载设备监控制动距离内列车运行时间进行牵引计算仿真,并运用三因素方差分析法分析了三因素的影响显著度,得到了线路限制速度、站前坡坡度对高铁车站接车进路长度影响显著的结论。最后,基于高铁车站接车进路长度计算模型,得到了一组指定到达追踪间隔下的高铁车站接车进路长度表,为高铁车站设计提供思路。

关 键 词:高铁车站  到达追踪间隔  接车进路长度  牵引计算  三因素方差分析

On the Length of Receiving Route of High-Speed Railway Station Based on Specified Train Arrival Tracking Interval
DANG Yangrui,CHEN Tao,ZHANG Jie,XIA Zhaohui.On the Length of Receiving Route of High-Speed Railway Station Based on Specified Train Arrival Tracking Interval[J].Comprehensive Transportation,2021(2):84-88.
Authors:DANG Yangrui  CHEN Tao  ZHANG Jie  XIA Zhaohui
Institution:(School of Transportation and Logistics,Southwest Jiaotong University,Chengdu 610031,China;National Railway Train Diagram Research and Training Center,Southwest Jiaotong University,Chengdu 610031,China;National and Local Joint Engineering Laboratory of Comprehensive Intelligent Transportation,Southwest Jiaotong University,Chengdu 610031,China;China Railway Yiyuan Survey and Design Group Co.,Ltd.,Xi’an 712000,China)
Abstract:It is important to determine the reasonable length of receiving route for high-speed railway station to reduce the arrival tracking interval time.In this paper,firstly,by constructing the calculation model of receiving route length in high-speed railway station to meet the arrival tracking interval time,it is proposed that the main influencing factors of receiving route length are the train running time within the braking distance monitored by on-board equipment,which are determined by three factors,namely,the line limited speed,the slope gradient in front of the station,and the braking force utilization coefficient.Then,through the traction calculation and Simulation of the train running time within the braking distance monitored by the onboard equipment under the common line speed limit,the slope gradient in front of the station and the braking force utilization coefficient,the influence significance of the three factors is analyzed by using the three factor analysis of variance,and the conclusion is drawn that the line speed limit and the slope gradient in front of the station have significant influence on the length of the receiving route of the high-speed railway station.Finally,according to the calculation model of receiving route length of high-speed railway station,obtaining a set of receiving route length table of high-speed railway station under specified arrival tracking interval is obtained,which provides ideas for the design of high-speed railway station.
Keywords:High speed railway  Train arrival tracking interval  Receiving route  Traction calculation  Three factor analysis of variance
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号