首页 | 本学科首页   官方微博 | 高级检索  
     检索      

后张法短束预应力钢绞线张拉伸长值控制分析与探讨
引用本文:杨铸.后张法短束预应力钢绞线张拉伸长值控制分析与探讨[J].铁道建筑技术,2014(3):83-85.
作者姓名:杨铸
作者单位:中铁二十二局集团第三工程有限公司,福建厦门361000
摘    要:针对施工中现浇箱梁短束预应力钢绞线实测伸长值超出现行公路桥涵规范中±6%的规定的问题,结合工程实例,对误差产生的原因进行分析与论证,并探讨了在施工中加强控制的合理建议。

关 键 词:后张法  短束预应力钢绞线  张拉伸长值  张拉控制

Analysis and Discussion on Stretch Control of Post-tension Short Beam Pres-stress Steel Strands
Yang Zhu.Analysis and Discussion on Stretch Control of Post-tension Short Beam Pres-stress Steel Strands[J].Railway Construction Technology,2014(3):83-85.
Authors:Yang Zhu
Institution:Yang Zhu ( China Railway 22^nd Bureau Group Co. Ltd. , Xiamen 361000, China)
Abstract:To solve the problem of the actual measured elongation of cast-in-place box girder short beam press-stress steel strands above ± 6% of the current highway bridge standard during construction, detailed analysis and calculation are carried out on the causes of the error combined with the actual engineering projects, and the reasonable suggestions are proposed to reinforce control.
Keywords:post-tension  short beam pre-stress steel strands  stretch value  stretch control
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号