首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三道渠铁路专用线建设方案研究
引用本文:朱国强.三道渠铁路专用线建设方案研究[J].铁道建筑技术,2014(8):65-67.
作者姓名:朱国强
作者单位:中铁第五勘察设计院集团有限公司,北京102600
摘    要:三道渠铁路专用线位于内蒙古自治区准格尔旗境内,专用线拟接轨于巴准线三道渠(预留)车站。根据储煤工艺园区的规划,以能够充分利用既有铺架基地设施,减少工程投资、满足运输作业需要为原则,结合地形、地貌等外部环境,对南侧纵列牵出式方案及南侧横列牵出式方案进行比较分析,推荐南侧纵列牵出式方案,为三道渠集运站煤炭提供外运保障。

关 键 词:巴准线  三道渠站  牵出式  方案比选

Research on Construction Scheme of Sandaoqu Special Railway Line
Zhu Guoqiang.Research on Construction Scheme of Sandaoqu Special Railway Line[J].Railway Construction Technology,2014(8):65-67.
Authors:Zhu Guoqiang
Institution:Zhu Guoqiang (China Railway Fifth Survey and Design Institute Group Co. Ltd. , Beijing 102600, China)
Abstract:Sandaoqu special railway line is located in the Inner Mongolia Autonomous Region Zhungeer.The special line is planned to the Sandaoqu (reserved)station.According to the planning of the coal storage technology park,in order to be able to make full use of both laying base facilities,reduce the project investment,meet the transportation needs,combined with the terrain,topography and other external environment,the paper makes a comparative analysis on the column pull type scheme and the transverse pull type scheme.And South tandem pull-out type scheme is recommended to provides transportation security for coal transportation of Sandaoqu station.
Keywords:Bazhun railway  Sandaoqu station  draw-out  scheme comparison
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号