大跨连续刚构桥左右幅同步顶推合龙施工技术
引用本文:仲维玲. 大跨连续刚构桥左右幅同步顶推合龙施工技术[J]. 铁道建筑技术, 2014, 0(5): 58-60
作者姓名:仲维玲
作者单位:中铁二十局集团有限公司,西安710016
摘    要:结合宝汉高速公路的施工实践,简要介绍了有"西北第一高墩"之称的五里坡特大桥主桥大跨连续刚构梁在高温不利条件下采用调整合龙顺序、左右幅同步顶推、同时合龙施工,最终既满足了桥梁的结构设计要求,又保证了工程的实际工期要求。

关 键 词:T构  同步顶推  合龙技术

Construction Technique of Both-halves Synchronized Pushing Closure of Large-span Continuous Rigid Frame Bridge
Zhong Weiling. Construction Technique of Both-halves Synchronized Pushing Closure of Large-span Continuous Rigid Frame Bridge[J]. Railway Construction Technology, 2014, 0(5): 58-60
Authors:Zhong Weiling
Affiliation:Zhong Weiling (China Railway 20th Bureau Group Co. Ltd. , Xi'an 710016, China)
Abstract:Based on practical construction of Baoji-Hanzhong Expressway, the paper introduces the construction technique of both-halves synchronized pushing and closure of large-span continuous rigid frame girder of Wulipo Extra Large Bridge called "Top 1 High Pier in Northwest China" with closure sequence adjustment under unfavorable condition of high temperature. It turns out that not only the requirements of bridge structural design is met, but also the construetion period is guaranteed.
Keywords:T structure  synchronized pushing  closure technique