超大吨位斜拉桥转体上跨铁路营业线施工技术探析 |
| |
引用本文: | 赵元龙.超大吨位斜拉桥转体上跨铁路营业线施工技术探析[J].时代汽车,2022(3):197-198. |
| |
作者姓名: | 赵元龙 |
| |
作者单位: | 中铁二十二局集团第一工程有限公司 |
| |
摘 要: | 文章以超大吨位斜拉桥转体上跨铁路营业线施工项目为例,简要阐述了工艺方案,并对准备、称重、转体、锁定等工艺操作要点进行了进一步探究,希望为超大吨位斜拉桥转体上跨铁路营业线施工提供一些参考.
|
关 键 词: | 超大吨位 斜拉桥 转体 上跨铁路 营业线施工 |
Discussion on Construction Technology of Super Large Tonnage Cable-stayed Bridge over Railway Business Line |
| |
Authors: | Zhao Yuanlong |
| |
Abstract: | Taking the construction project of super large tonnage cable-stayed bridge over the railway business line as an example,this paper briefly expounds the process scheme,and further explores the key points of process operation such as preparation,weighing,rotation and locking,hoping to provide some reference for the construction of super large tonnage cable-stayed bridge over the railway business line. |
| |
Keywords: | Super tonnage cable-stayed bridge swivel overpass railway business line construction |