软岩地层泥水盾构掘进刀盘堵塞现象研究
引用本文:袁大军,毛家骅,王将,王小宇. 软岩地层泥水盾构掘进刀盘堵塞现象研究[J]. 中国公路学报, 2022, 35(4): 177-185. DOI: 10.19721/j.cnki.1001-7372.2022.04.014
作者姓名:袁大军  毛家骅  王将  王小宇
作者单位:1. 北京交通大学 隧道与地下工程教育部工程研究中心, 北京 100044;2. 北京交通大学 土木建筑 工程学院, 北京 100044;3. 宁波工程学院 建筑与交通工程学院, 浙江 宁波 315211
基金项目:国家自然科学基金联合基金项目(U1834208)
摘    要:软岩地层(黏性矿物含量高)泥水盾构掘进刀盘堵塞现象(刀盘结泥饼)时有发生,不仅影响施工进度和质量,而且开舱处理风险较大,可能会导致人身伤亡或工程事故.为了探明刀盘堵塞现象及其影响因素,实现对刀盘堵塞的有效预防和治理,研发了一套软岩地层泥水盾构掘进模型试验装置.在自行设计、制作的模型试验平台上,选用以膨润土、高岭土、石英...

关 键 词:隧道工程  刀盘堵塞  模型试验  泥水盾构  软岩  堵塞预测
收稿时间:2021-01-11

Study on Clogging Phenomenon on Cutterhead of Slurry Shield Machine Tunneling Under Soft Rock
YUAN Da-jun,MAO Jia-hua,WANG Jiang,WANG Xiao-yu. Study on Clogging Phenomenon on Cutterhead of Slurry Shield Machine Tunneling Under Soft Rock[J]. China Journal of Highway and Transport, 2022, 35(4): 177-185. DOI: 10.19721/j.cnki.1001-7372.2022.04.014
Authors:YUAN Da-jun  MAO Jia-hua  WANG Jiang  WANG Xiao-yu
Affiliation:1. Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China;2. School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China;3. School of Civil and Transportation Engineering, Ningbo University of Technology, Ningbo 315211, Zhejiang, China
Abstract:The clogging phenomenon occurred frequently on the cutterhead of a slurry shield when it tunnelling under soft rock, which contains a large amount of clay minerals. This phenomenon not only delays the construction schedule and lowers the project quality, but also has a higher risk of opening the chamber, and even causing personal injury or engineering accidents. To investigate the clogging phenomenon of the cutterhead of a slurry shield machine and its influencing factors under soft rock, which contains a mass of clay mineral, a model test apparatus was designed to simulate the process of slurry shield tunnelling under soft rock. Artificial soft rock was prepared from bentonite, kaolin, quartz sand, cement, and water. The test was conducted under different conditions of artificial soft rock, driving velocity, cutter length and type, and slurry (or water) washout flux. The clogging phenomenon of the cutterhead could be observed in the tests. The torque, trust, and driving distance of the shield machine were analyzed, and it was found that the torque index and its change rate on the driving distance can be used as double indicators to judge the clogging of the cutterhead during shield tunnelling. The test results show that when the torque index and its increase rate were more than 0.10 and 0.40, respectively, the clogging phenomenon occurred. In addition, an increase in the driving velocity of the shield makes the clogging phenomenon more likely and it was also determined that decreasing the length of the cutters and the slurry washout device has a high effect in preventing the clogging phenomenon of the cutterhead. It is important to note that the washout flux needs to be large enough to ensure that the muck is stripped and carried out from the cutterhead plate.
Keywords:tunnel engineering  cutterhead clogging  model experiment  slurry shield  soft rock  clogging prediction  