首页 | 本学科首页   官方微博 | 高级检索  
     检索      

摇前隧道右线出口段洞身沉陷的原因分析和处理
引用本文:黄礼章.摇前隧道右线出口段洞身沉陷的原因分析和处理[J].现代交通技术,2010,7(3):67-69.
作者姓名:黄礼章
作者单位:南平松建高速公路有限责任公司,福建,南平,353000
摘    要:在不良地质、浅埋地段隧道施工难度和风险极大,地表和洞身沉陷是施工中常见的一种事故。文章结合摇前隧道右线出口不良地质地段地表和洞身沉陷事故,对工程监控量测、应急处理、原因分析和整治处理方案及整治效果进行介绍,以期为类似事故的处理提供参考。

关 键 词:隧道  洞身沉陷  应急处理  方案论证  施工

Analysis and Disposal of Tunnel Body Subsidence in the Exit of Right Line Yaoqian Tunnel
Huang Lizhang.Analysis and Disposal of Tunnel Body Subsidence in the Exit of Right Line Yaoqian Tunnel[J].Modern Transportation Technology,2010,7(3):67-69.
Authors:Huang Lizhang
Institution:Huang Lizhang ( Nanping Songjian Expressway Co., Ltd, Nanping 353000, China)
Abstract:Construction difficulties and risk are enormous in bad geology and shallow sections, while surface and tunnel body subsidence is a kind of familiar accident in construction. According to the surface and tunnel body subsidence accident which happened in bad geological sections of the Yaoqian right tunnel exit, this paper introduces it's monitoring measurement, urgent disposal, cause analysis, renovating scheme and renovating effect. The research results could offer reference to the treatment of similar accidents.
Keywords:tunnel  body subsidence  urgent disposal  scheme demcnstratiou  construction
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号