首页 | 本学科首页   官方微博 | 高级检索  
     

东海大桥海上中横梁浇筑和箱梁成联施工
引用本文:黄海涛,刘志华,赵捷. 东海大桥海上中横梁浇筑和箱梁成联施工[J]. 城市道桥与防洪, 2006, 0(5): 99-101
作者姓名:黄海涛  刘志华  赵捷
作者单位:上海市第二市政工程公司,上海市,200065;上海市第二市政工程公司,上海市,200065;上海市第二市政工程公司,上海市,200065
摘    要:东海大桥是我国真正意义上的跨海大桥,施工难度高,施工工艺复杂。该文较为详细地阐述了海上现浇中横梁的施工方法,该方法通过了实践的考验,对类似桥梁的施工可起到借鉴的作用。

关 键 词:东海大桥  跨海大桥  中横梁  箱梁成联
文章编号:1009-7716(2006)05-0099-03
收稿时间:2006-03-17
修稿时间:2006-03-17

Construction of Center Cross Beam Pouring and Box Beam Connection
Huang Haitao,Liu Zhihua,Zhao Jie. Construction of Center Cross Beam Pouring and Box Beam Connection[J]. Urban Roads Bridges & Flood Control, 2006, 0(5): 99-101
Authors:Huang Haitao  Liu Zhihua  Zhao Jie
Abstract:Donghai Bridge is a bridge really significantly crossing the sea in China. Its construction is very difficult and its construction technology is complicated. The article sets forth the construction method of the on-sea cast-in-place center cross beam in more detail. This method after the practical test can play the reference role in the construction of the similar bridges
Keywords:Donghai Bridge   crossing-sea bridge   center cross beam   box beam connection
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号