高速公路机电工程联合设计阶段方案的优化 |
| |
引用本文: | 曾玥琳,张乐乐.高速公路机电工程联合设计阶段方案的优化[J].内蒙古公路与运输,2009(5):36-38. |
| |
作者姓名: | 曾玥琳 张乐乐 |
| |
作者单位: | 1. 重庆市华驰交通科技有限公司,重庆,400074 2. 重庆科技学院机械与动力工程学院 |
| |
摘 要: | 结合西部开发省际公路通道重庆至长沙公路武隆至水江段高速公路机电工程联合设计的具体情况,探讨了如何根据工程的实际情况,有针对性地进行联合设计阶段的方案优化。
|
关 键 词: | 高速公路 机电工程 联合设计 方案优化 |
Control for leakage water at the local wall-rock around tunnel during excavation |
| |
Abstract: | This article is based on specific conditions of engineering design of WuLong highway channels to ShuiJiang highway of a provincial highway development in western chongqing to changsha,exploring how to targeted on the scheme optimization design stage according to the actual situation of engineering. |
| |
Keywords: | Mountainous Highway Mechanical and Electrical Engineering Joint Design Stage Optimization scheme |
本文献已被 维普 万方数据 等数据库收录! |