首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南宁枢纽总图与北部湾经济区铁路建设布局的综合研究
引用本文:高丰农,龙顺海.南宁枢纽总图与北部湾经济区铁路建设布局的综合研究[J].铁道工程学报,2007,24(6):71-74.
作者姓名:高丰农  龙顺海
作者单位:中铁二院工程集团有限责任公司,成都,610031
摘    要:研究目的:通过对南宁市及北部湾经济区产业布局的综合研究,提出适合广西自治区经济发展的南宁铁路枢纽总图规划和北部湾经济区铁路建设布局。 研究方法:根据南宁市及北部湾经济区城市规划、产业布局规划、枢纽现状和路网规划,综合分析研究南宁铁路枢纽总图与北部湾经济区铁路建设布局。 研究结论:北部湾经济区铁路建设布局与南宁枢纽综合研究是北部湾经济区经济发展、城市群建设和铁路运输生产力布局的必然要求,最终确定枢纽衔接3条干线、3条城际铁路,6个行车方向,客运形成环型通道,货运形成以南环为主的“T型”通道,客货分线的“环+T型”枢纽格局。

关 键 词:南宁市  北部湾  枢纽总图  铁路  布局  规划
文章编号:1006-2106(2007)06-0071-04
修稿时间:2007-05-29

Comprehensive Research on the General Layout of Nanning Terminal and Overall Arrangement of Railway Construction in Beibu Bay Economic Zone
GAO Feng-nong,LONG Shun-hai.Comprehensive Research on the General Layout of Nanning Terminal and Overall Arrangement of Railway Construction in Beibu Bay Economic Zone[J].Journal of Railway Engineering Society,2007,24(6):71-74.
Authors:GAO Feng-nong  LONG Shun-hai
Institution:China Railway Eryuan Engineering Group Co. Ltd, Chengdu, Sichuan 610031, China
Abstract:Research purposes: By comprehensive research for Nanning city and industry planning of Beibu Bay economic zone,general layout of terminal and arrangement of railway construction in the Beibu Bay economic developing zone fit for the economic development of Guangxi municipality are put forward. Research methods:The comprehensive analysis and research has been performed of general layout of terminal and arrangement of railway construction in the Beibu Bay economic developing zone as per urban planning,industry planning and present state of terminal and railway network planning of Nanning city and Beibu Bay economic zone.Research conclusions:It is a natural demand for the economic development in Beibu Bay Economic Zone,construction of city complex and productive capacity of railway transportation to do the comprehensive research on the general layout of Nanning Terminal and overall arrangement of railway construction in Beibu Bay Economic Zone.It is decided finally Nanning Terminal is linked with three main railway lines and 3 intercity railway lines to 6 travel directions to form a terminal pattern with loop corridor for passenger traffic and "T" corridor dominated by Southern Loop Line for freight traffic.
Keywords:Nanning City  Beibu Bay  general layout of terminal  railway  arrangement  plan
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号