临近高压电塔隧道施工技术
引用本文:黎小辉,刘关华.临近高压电塔隧道施工技术[J].现代城市轨道交通,2012(4):30-33.
作者姓名:黎小辉  刘关华
作者单位:1. 北京市轨道交通建设管理有限公司,工程师,北京100037
2. 不详
摘    要:矿山法区间隧道临近高压电塔施工为小近距施工属于一级环境风险工程,为了避免地面作业对高压电塔的影响,对隧道施工采取洞内注浆加固综合措施。文章简要介绍砂卵石地层中,小近距临近高压电塔隧道洞内注浆加固施工技术措施、施工控制要点和施工工艺。

关 键 词:隧道  小近距  施工  技术

Construction Technology for Tunnel with Adjacent High-Voltage Tower
Li Xiaohui, Liu Guanhua.Construction Technology for Tunnel with Adjacent High-Voltage Tower[J].Modern Urban Transit,2012(4):30-33.
Authors:Li Xiaohui  Liu Guanhua
Institution:Li Xiaohui, Liu Guanhua
Abstract:Boring method in the construction of section tunnel with adjacent high-voltage tower is an interruption work, and the construction is classified as an environmental risk project. In order to avoid ground operation impact on high-voltage tower, comprehensive measures have been taken inside tunnel including the grouting reinforcement in tunnel construction. The article briefly describes grouting reinforcement construction measures in sand and gravel strata for adjacent high voltage tower, key points for construction control and construction process.
Keywords:tunnel  adjacent  construction  technology