首页 | 本学科首页   官方微博 | 高级检索  
     检索      

卸煤码头升级改造设计要点
引用本文:何建腾.卸煤码头升级改造设计要点[J].水运工程,2012(11):102-106.
作者姓名:何建腾
作者单位:中交四航局港湾工程设计院有限公司,广东广州,510231
摘    要:为了节约岸线资源,保证港口作业安全,实现港口的可持续发展,对旧有码头进行升级改造是目前水运设计行业面临的重要课题.以广东地区广州珠江电厂、深圳妈湾电厂、东莞沙角A电厂卸煤码头升级改造为例,阐述和分析了设计中遇到的结构方案、装卸工艺和码头附属设施等主要问题和解决方法,为类似工程提供参考和借鉴.

关 键 词:码头  升级  设计

Designing essentials in upgrading engineering of coal unloading terminal
HE Jian-teng.Designing essentials in upgrading engineering of coal unloading terminal[J].Port & Waterway Engineering,2012(11):102-106.
Authors:HE Jian-teng
Institution:Engineering Design Co., Ltd. of CCCC Fourth Harbor Engineering Co., Ltd., Guangzhou 510231, China
Abstract:In order to save the coast line resource and guarantee the safety of port operation so as to realize the sustainable development of the port, the upgrading and renovation to the existing wharf tends to be a significant issue of water transport design industry. Taking the renovation project of Guangzhou Zhujiang Power Plant, Shenzhen Mawan Power Plant, Dongguan Shajiao Power Plant A as a study case, this paper analyzes the main problems and solutions concerning the structural plan, handling technology, and wharf auxiliary facilities in the design, hoping to serve as a reference for similar engineering projects.
Keywords:coal terminal  upgrading  design
本文献已被 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号