威远互通立交E匝道现浇箱梁施工工艺及应用实例 |
| |
引用本文: | 邵明涛,徐爱辉.威远互通立交E匝道现浇箱梁施工工艺及应用实例[J].北方交通,2012(9):84-86. |
| |
作者姓名: | 邵明涛 徐爱辉 |
| |
作者单位: | 辽宁省路桥建设集团有限公司第三分公司,沈阳,110021 |
| |
摘 要: | 介绍了威远互通立交E匝道现浇箱梁施工过程。阐述了现浇箱梁的施工工艺,该工艺不仅施工速度快,而且能保证箱梁的质量。
|
关 键 词: | 威远立交 现浇箱梁 预应力张拉 |
Construction Technology and Application Example of Cast Box Girder of Weiyuan Interchange E Ramp - place |
| |
Institution: | SHAO Ming-tao and others |
| |
Abstract: | The construction process of Weiyuan interchange E ramp cast-in-place box girder is introduced.Construction technology of cast-in-situ box girder is elaborated.This technology not only has fast construction speed,but also can ensure the quality of box girder. |
| |
Keywords: | Weiyuan interchange Cast- in- situ box girder Prestressed tension |