首页 | 本学科首页   官方微博 | 高级检索  
     检索      

填海工程BIM技术开发与应用
引用本文:谢锦波,张 海,时蓓玲,张 曦.填海工程BIM技术开发与应用[J].水运工程,2019(6):136-139.
作者姓名:谢锦波  张 海  时蓓玲  张 曦
作者单位:中交上海三航科学研究院有限公司,上海 200032,中交上海三航科学研究院有限公司,上海 200032,中交第三航务工程局有限公司,上海 200032,中交上海三航科学研究院有限公司,上海 200032
摘    要:针对当前通用BIM建模软件无法反映填海工程的大沉降量问题,基于商用BIM软件进行二次开发,创建了填海工程BIM应用管理平台。平台支持监测数据的实时导入,实现了BIM模型与施工期沉降监测数据的动态关联。该平台可通过读取钻孔数据实现BIM模型生成,支持4种填海工程常用的监测数据分析与管理功能;并可以调用Navisworks软件实现施工进度与工程量的管理。此外,开发的专用数据库网站,利用配置权限、异地备份、数据加密等手段,提供数据存储、安全策略、数据归档的一整套解决方案。平台成功应用于实际工程中,效果良好。

关 键 词:填海工程  建筑信息模型  动态关联  BIM平台

Development and application of BIM technology in reclamation engineering
XIE Jin-bo,ZHANG Hai,SHI Bei-ling and ZHANG Xi.Development and application of BIM technology in reclamation engineering[J].Port & Waterway Engineering,2019(6):136-139.
Authors:XIE Jin-bo  ZHANG Hai  SHI Bei-ling and ZHANG Xi
Institution:CCCC Shanghai Third Harbor Engineering Science & Technology Research Institute Co.,Ltd.,Shanghai 200032,China,CCCC Shanghai Third Harbor Engineering Science & Technology Research Institute Co.,Ltd.,Shanghai 200032,China,CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200032,China and CCCC Shanghai Third Harbor Engineering Science & Technology Research Institute Co.,Ltd.,Shanghai 200032,China
Abstract:The current general BIM modeling software can not reflect the large settlement in reclamation works,so the BIM application management system for the reclamation engineering is created by the secondary development based on commercial softwares.The monitoring data can be imported in real time and dynamic correlation between the BIM model and settlement monitoring data during construction can be achieved.The system integrates the BIM model generation using borehole data,4 common monitoring data analysis and management functions.The construction schedule and engineering quantity management can also be achieved by calling Navisworks.In addition,a special database website is developed,which provides a complete set of solutions for the data storage,safety strategy and data archiving by means of configuring permissions,backuping in different places and data encryption.This system has been successfully applied to the practical project and achieved good results.
Keywords:reclamation engineering  building information model  dynamic correlation  BIM system
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号