首页 | 本学科首页   官方微博 | 高级检索  
     

独塔双索面自锚式无缝悬索桥的设计与分析
引用本文:平树江,桂学,李玉青,郭斌. 独塔双索面自锚式无缝悬索桥的设计与分析[J]. 公路, 2012, 0(3): 70-73
作者姓名:平树江  桂学  李玉青  郭斌
作者单位:1. 北京大学工学院 北京市 100871;山东省滨州市公路勘察设计院 滨州市 256603
2. 陕西飞虹桥梁勘测设计研究有限公司 西安市 710054
3. 山东省滨州市公路勘察设计院 滨州市 256603
4. 沾化公路管理局 滨州市 256614
摘    要:考虑柳青河桥的景观效果和满足河道通航要求,设计采用了独塔双索面自锚式无缝悬索桥,桥型优美轻便,主缆直接锚固在加劲梁梁端,节省了庞大的锚碇结构.由于主跨与边跨跨径比很大,在边跨适当配重的基础上,设计采用了半整体式桥台,利用桥台台身的重量来克服端支座拉力,既解决了拉力支座的问题,同时在该桥台处形成了无缝桥梁.重点介绍了柳青河自锚式无缝悬索桥的结构构造、设计要点及计算分析过程,以期供类似桥梁设计借鉴.

关 键 词:独塔双索面  自锚式悬索桥  半整体式桥台  结构设计

Design and Analysis of Self-anchored Seamless Suspension Bridge with Single Tower and Double Cable
PING Shu-jiang , GUI Xue , LI Yu-qing , GUO Bin. Design and Analysis of Self-anchored Seamless Suspension Bridge with Single Tower and Double Cable[J]. Highway, 2012, 0(3): 70-73
Authors:PING Shu-jiang    GUI Xue    LI Yu-qing    GUO Bin
Affiliation:1.College of Engineening,Peking University,Beijing 100871,China;2.Binzhou Highway Survey and Design institue,Binzhou 256603,China; 3.Shannxi Feihong Bridge Survery and Design Research Ltd,Xi’an 710054,China; 4.Zhanhua Highway Administration Bureau,Binzhou 256614,China)
Abstract:Considering the scenic effect and meeting the needs of the waterway navigation of Liuqing River Bridge,the design used the self-anchored seamless suspension bridge with single tower and double cable that has beautiful and light bridge type,and saves a huge anchorage structure for its main cable is directly anchored at the end of the stiffening beam.As the span ratio of the main span and the side span are large,the semi-integral abutment is used to overcome the tension of the bearings with its dead weight on the basis that the side span has proper counter weight.It is meant that the problem of tension bearings is resolved,and a seamless bridge is formed at the abutment.In this paper,in order to offering reference to the design of the similar bridge,the structure construction,the design points and the calculation and ana-lysis process of Liuqing River Self-anchored Seamless Suspension Bridge are mainly introduced.
Keywords:single tower and double cable  self-anchored suspension  semi-integral abutment  structure construction  design
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号