首页 | 本学科首页   官方微博 | 高级检索  
     检索      

上海长华路长桥主桥施工控制
引用本文:姚荣明.上海长华路长桥主桥施工控制[J].城市道桥与防洪,2007(4):128-130.
作者姓名:姚荣明
作者单位:上海斯美科汇建设工程咨询有限公司,上海市,200092
摘    要:该文介绍了上海长华路长桥主桥施工方案,介绍了其监控计算与控制方案,对中跨合龙可能产生误差的原因进行了分析,并对合龙误差进行预测,根据理论计算预先采取消除措施,同时,对施工监控结果进行了分析。

关 键 词:连续梁  施工控制  监控计算  合龙误差
文章编号:1009-7716(2007)04-0128-03
收稿时间:2007-01-26
修稿时间:2007年1月26日

Construction Control of Main Bridge of Chang Bridge on Changhua Road in Shanghai
Yao Rongming.Construction Control of Main Bridge of Chang Bridge on Changhua Road in Shanghai[J].Urban Roads Bridges & Flood Control,2007(4):128-130.
Authors:Yao Rongming
Institution:Yao Rongming
Abstract:The article introduces the construction scheme of the main bridge of Chang Bridge on Changhua Road in Shanghai, introduces its monitoring calculation and control scheme, analyzes the reasons possibly to produce the errors in the closing up of the middle span, forecast the error of the closing up. Based on the theoretical calculation, the removal measures are taken in advance. At the same time, the construction monitoring results are analyzed.
Keywords:continuous girder  construction control  monitoring calculation  error of closing up
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号