首页 | 本学科首页   官方微博 | 高级检索  
     

地铁暗挖车站紧邻高层建筑物摩擦桩基础施工技术
引用本文:郭卫社,朱永全. 地铁暗挖车站紧邻高层建筑物摩擦桩基础施工技术[J]. 隧道建设, 2007, 27(4): 48-51
作者姓名:郭卫社  朱永全
作者单位:1. 中铁隧道集团有限公司,河南,洛阳,471009
2. 石家庄铁道学院,石家庄,050043
摘    要:高层建筑的摩擦桩基础极易受暗挖隧道影响而产生不均匀沉降。广州地铁五号线小北站暗挖隧道近距离通过既有摩擦桩群,车站地质条件复杂,施工难度极大。以成功的工程实例做背景,详细阐述了地铁车站暗挖隧道紧邻高层建筑摩擦桩基础的施工技术。

关 键 词:车站 隧道摩擦桩高层建筑物
收稿时间:2007-04-06
修稿时间:2007-04-06

Construction Technique of Metro Station Tunnel Close to High-rise Buildings with Frictional Pile Foundation
GUO Wei-she,ZHU Yong-quan. Construction Technique of Metro Station Tunnel Close to High-rise Buildings with Frictional Pile Foundation[J]. Tunnel Construction, 2007, 27(4): 48-51
Authors:GUO Wei-she  ZHU Yong-quan
Affiliation:1. China Railway Tunnel Group Co. ,Ltd. , Luoyang 471009, Henan, China; 2. Shijiazhuang Railway Institute, Shijiazhuang 050043, China
Abstract:Differential settlement is subject to occur to the high-rise buildings with friction pile foundations, which are easily affected by the tunnel excavation activities. The underground tunnel of Xiaobei station on line 5 of Guangzhou Metro passes close to the existing friction piles and the geological condition of the Metro station is complex, therefore there exist great difficulties in the construction of the underground tunnel. On basis of the successful case history, the paper presents the construction technology for the underground tunnel of the Metro station that passes close to the highrise buildings with friction pile foundations.
Keywords:station    tunnel    friction pile    high-rise building
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号