首页 | 本学科首页   官方微博 | 高级检索  
     检索      

通州沙西水道整治对12.5m深水航道影响研究及对策分析
引用本文:杜德军,夏云峰,吴道文,闻云呈,徐 华,张世钊.通州沙西水道整治对12.5m深水航道影响研究及对策分析[J].水运工程,2014(8):101-106.
作者姓名:杜德军  夏云峰  吴道文  闻云呈  徐 华  张世钊
作者单位:南京水利科学研究院,江苏南京,210029
基金项目:交通运输部重大科技专项(201132874660)
摘    要:为分析通州沙西水道整治工程对长江南京以下12.5 m深水航道整治一期工程的影响,通过物理模型试验进行深入研究。研究表明,西水道整治工程实施后,西水道开挖至-8 m或不开挖,东水道分流比增加,对深水航道影响较小,但会造成深水航道左侧通州沙滩地窜沟的冲刷;随着开挖深度增加,其对深水航道影响逐渐增加,开挖至-12 m、-14.7 m时,航道沿程会出现一定淤积,营船港下航道浅区有淤积的趋势,不利于航道维护,但通州沙滩地窜沟略有淤积。建议:通州沙西水道整治时,西水道疏浚深度不宜过深;尽快实施通州沙潜堤下延工程。

关 键 词:长江  12.5  m深水航道  通州沙  西水道整治  模型试验  疏浚

Influences of Tongzhou shoal west channel regulation on 12.5 m deepwater channel and countermeasures
DU De-jun,XIA Yun-feng,WU Dao-wen,WEN Yun-cheng,XU Hua and ZHANG Shi-zhao.Influences of Tongzhou shoal west channel regulation on 12.5 m deepwater channel and countermeasures[J].Port & Waterway Engineering,2014(8):101-106.
Authors:DU De-jun  XIA Yun-feng  WU Dao-wen  WEN Yun-cheng  XU Hua and ZHANG Shi-zhao
Institution:Nanjing Hydraulic Research Institute,Nanjing 210029,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China;Nanjing Hydraulic Research Institute,Nanjing 210029,China
Abstract:In the existing model of the Yangtze River estuary section,through movable bed model experiment,the influences on 12.5 m deepwater channel phase I project of Tongzhou shoal west channel regulation project are studied.After implementing the west channel regulation project,the -8 m excavation scheme and no excavation scheme are both good for the maintenance of deepwater channel depth,but Tongzhou shoal beach ditches on the left side of the deepwater channel are eroded.With the increase of the excavation depth,the impacts on the deepwater channel increase gradually.When the excavation is to -12 m or -14.7 m,the influences reach Yingchuangang,but beach ditches are slightly deposited,which are favorable for the stability of the sand body.This study proposes that the excavation depth should not be too large,and the downstream extension engineering of Tongzhou shoal submerged breakwater should be implemented as soon as possible.
Keywords:the Yangtze River  12  5 m deepwater channel  Tongzhou shoal  west channel regulation  model test  dredging
本文献已被 CNKI 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号