首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高速公路路基沉降的快速预测方法
引用本文:龚志刚,何良德,王雅明,李王红.高速公路路基沉降的快速预测方法[J].现代交通技术,2008,5(2):5-9.
作者姓名:龚志刚  何良德  王雅明  李王红
作者单位:1. 嘉兴市交通投资集团有限责任公司,浙江嘉兴,314001
2. 河海大学交通学院,江苏南京,210098
摘    要:高速公路沉降控制的关键是在填筑期末能够及时准确地预测预压路基的沉降,包括欠载、等载或超载预压路段在预压期以及(卸载后)路面施工期和通车后的沉降、速率过程。基于太沙基理论和线弹性假设,提出了一种不需要具备荷载稳定期观测资料。可以及时快速进行沉降预测的方法。研究了多级荷载作用下考虑卸载与回弹的沉降预测模型.探讨了荷载稳定期内速率衰减特性、卸载前后速率变化规律。结合工程实例,讨论了动态反演的实施方法.验证了快速预测方法的可行性、适用性和合理性。

关 键 词:路基沉降  动态控制  快速预测  速率衰减率  卸载后速率
文章编号:1672-9889(2008)02-0005-05
修稿时间:2007年11月15

A New Formula Model of Fast Predicting Settlement for Expressway Subgrade
Gong Zhigang,He Liangde,Wang Yaning,Li Wanghong.A New Formula Model of Fast Predicting Settlement for Expressway Subgrade[J].Modern Transportation Technology,2008,5(2):5-9.
Authors:Gong Zhigang  He Liangde  Wang Yaning  Li Wanghong
Institution:Gong Zhigang, He Liangde, Wang Yaming, Li Wanghong (1.Jiaxing Communication Investment Group Co., Ltd, Jiaxing 3140001, China; 2.College of Traffic Engineering, Hohai University, Nanjing 210098, China)
Abstract:The key of the expressway settlement dynamic control is to predict settlement for preloading subgrade in time and accurately when fill construction is about to be finished, including the settlement process, speeding process of underloading, equal loading or overloading prepressed section during the period of prepressing and road construction, as well as open to traffic. Based on hypothesis of Terzaghi theory and linear elastic, this paper proposes a new settlement prediction method which needs no observation data during the loading stabilization, and may make predictions timely and accurately. This paper also studies settlement prediction model about mult-loading action which takes unloading and spring back factor into consideration, and discusses characteristics of speed attenuation during the loading stabilization and the rule of speed change front-to-back unloading. Through engineering case study, the optimization method of dynamic inverse analysis is put in practice. Furthermore, the feasibility, the applicability and the rationality of the proposed prediction method are verified,
Keywords:subgrade settlement  dynamic control  fast prediction  speed attenuation rate  speed after unloading
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《现代交通技术》浏览原始摘要信息
点击此处可从《现代交通技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号