首页 | 本学科首页   官方微博 | 高级检索  
     

自锚式悬索桥索塔顶横梁支架设计方案比选
引用本文:颜离园. 自锚式悬索桥索塔顶横梁支架设计方案比选[J]. 国防交通工程与技术, 2012, 0(3): 18-20,10
作者姓名:颜离园
作者单位:中铁第五勘察设计院集团有限公司,北京102600
摘    要:京承联络线潮白河大桥的索塔顶横梁构造复杂,永久结构预埋件和施工预埋件种类、数量繁多,施工工艺复杂,占用工期较长。针对这一特点,索塔横梁支架设计了两种不同方案:钢管立柱支架方案与桁架组合构件支架方案,从结构受力、可实施性、安全性、经济性等方面综合比选,选择了有利于索塔顶横梁施工的技术方案。

关 键 词:自锚式悬索桥  索塔顶横梁  支架设计  方案比选

Comparison and Choice of the Design Schemes for Brackets at the Top of the Cable Towers of the Self-Anchored Suspension Bridge
Yan Liyuan. Comparison and Choice of the Design Schemes for Brackets at the Top of the Cable Towers of the Self-Anchored Suspension Bridge[J]. Traffic Engineering and Technology for National Defence, 2012, 0(3): 18-20,10
Authors:Yan Liyuan
Affiliation:Yan Liyuan (The 5th Reconnaissance and Design Institution Group of the Railway Building Corporation of China,Beijing 102600, China)
Abstract:Considering the fact that the lateral beams at the top of the cable tower of the Chaobai River Bridge of the Beijing- Chengde Liaison Railway are complex in structure, the number of the types of embedded parts for permanent structures and construction is large, the construction processes are complex and the construction duration is rather long, two different schemes are designed for the brackets: the scheme of steel pipe column supports and the scheme of truss-combined member supports. Upon the basis of comparing the different situations of the forces of the structure, the feasibility, security, economy, etc. of the two schemes in an all-round way, finally chosen is a right technical scheme, which greatly facilitates the construction of the lateral beams at the top of the cable towers.
Keywords:self-anchored suspension bridge  lateral beam at the top of the cable tower  design of the bracket  comparison and choice of the right scheme
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号