首页 | 本学科首页   官方微博 | 高级检索  
     

基于PSPC的管系生产设计优化措施探讨
引用本文:安志杰. 基于PSPC的管系生产设计优化措施探讨[J]. 船海工程, 2014, 0(2): 87-90
作者姓名:安志杰
作者单位:武昌船舶重工有限责任公司,武汉430060
摘    要:针对PSPC国际涂装规则的施工要求,分析管系生产设计的优化措施,主要包含提前考虑涂装环形施工空间及管支架提前安装等。采用无焊接管支架,无焊接接头及管系开孔的精确统计措施,优化管系安装设计,使PSPC实施区域管路安装准确,无二次修改,保证了涂装的施工效果和质量。

关 键 词:管系安装  环形施工空间  管支架提前安装  无焊接管支架  无焊接接头

On the Piping Production Design Optimization Measures Based on PSPC
AN Zhi-jie. On the Piping Production Design Optimization Measures Based on PSPC[J]. Ship &Ocean Engineering, 2014, 0(2): 87-90
Authors:AN Zhi-jie
Affiliation:AN Zhi-jie (Wuchang shipbuilding Industry Co. Ltd. , Wuhan 430060, China)
Abstract:Aiming at the construction requirements of PSPC international painting code , the piping production design optimi-zation measures were analyzed , including consideration of painting construction annular space , the method of preinstall pipe clamp, used non-welded pipe clamp , used non-welded connector , exactitude statistic of pipes opening , optimization the piping installation etc .These methods can make sure pipe install accuracy and need not second modified in PSPC construction area , so as to ensure the PSPC construction purpose and quality .
Keywords:piping installation  annular construction space  preinstall of pipes clamp  non-welded pipe clamp  non-welded connector
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号