首页 | 本学科首页   官方微博 | 高级检索  
     

丽香铁路中义隧道预应力树脂锚杆设计施工关键技术
引用本文:李贵民,郭永发,赵海燕. 丽香铁路中义隧道预应力树脂锚杆设计施工关键技术[J]. 中国铁路, 2021, 0(2): 17-26
作者姓名:李贵民  郭永发  赵海燕
作者单位:中铁二院昆明勘察设计研究院有限责任公司
基金项目:云南省科技厅重点研发计划项目(2018BC008)。
摘    要:以丽香铁路中义隧道预应力树脂锚杆试验段为工程依托,对初支钢架大变形问题的系统锚杆效果进行研究.中义隧道地质为高地应力碎裂化玄武岩,开挖后初支钢架变形极为严重,关键线路工期滞后较多,且剩余地段围岩以V级大变形为主,施工难度高、进度慢,需进一步研究变形控制及加快施工进度措施.根据煤矿行业相关工程经验,在以预应力树脂锚杆为主...

关 键 词:丽香铁路  中义隧道  大变形  预应力  树脂锚杆  抗拔力  单日变形速率

Key Design and Construction Technologies of Prestressed Resin Rockbolts in Zhongyi Tunnel of Lijiang-Shangrila Railway
LI Guimin,GUO Yongfa,ZHAO Haiyan. Key Design and Construction Technologies of Prestressed Resin Rockbolts in Zhongyi Tunnel of Lijiang-Shangrila Railway[J]. Chinese Railways, 2021, 0(2): 17-26
Authors:LI Guimin  GUO Yongfa  ZHAO Haiyan
Affiliation:(Kunming Survey,Design and Research Institute Co Ltd of CREEC,Kunming Yunnan 650200,China)
Abstract:Based on the test section of prestressed resin bolts in Zhongyi Tunnel of Lijiang-Shangrila Railway,the effect of system anchor bolts on large deformation of initial support steel frame is studied.Zhongyi Tunnel is geologically dominated by cataclastic basalt with high crustal stress.The deformation of initial support steel frame is extremely serious after excavation,and the construction of tracks lags behind.The surrounding rocks in the remaining sections are mainly deformed at Grade V,which makes the construction difficult and slow.Therefore,it is necessary to further study the measures for deformation control and acceleration of construction progress.According to relevant engineering experience of coal mine industry,the field test on construction technologies and methods are carried out in time based on the active support system scheme,focusing on the prestressed resin rock bolts.The test results show that the prestressed resin rock bolts can effectively provide uplift resistance and obviously reduce single-day deformation rate to avoid arch replacement due to the invasion of initial support,effectively control the cumulative deformation of the test section and greatly improve the construction progress,which may provide a reference for similar projects such as Sichuan-Tibet Railway and Yunnan-Tibet Railway.
Keywords:Lijiang-Shangrila Railway  Zhongyi Tunnel  large deformation  prestressed  resin rockbolts  uplift resistance  single-day deformation rate
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号