盾构穿越拔桩及箱涵区的施工技术
引用本文:赵菁.盾构穿越拔桩及箱涵区的施工技术[J].地下工程与隧道,2011(3):23-25,56.
作者姓名:赵菁
作者单位:上海隧道工程股份有限公司;
摘    要:结合深圳地铁2号线,介绍了2204标海月站一登良路区间隧道盾构穿越拔桩区及箱涵区的施工技术和实施效果,详细分析了拔桩施工的技术特点及施工监测过程,可供类似工程借鉴。

关 键 词:地铁区间隧道  盾构穿越  箱涵区及拔桩区  施工  监测

Construction Technology of Shield Driving through Pile Pulling and Box Culvert Areas
Zhao Jing.Construction Technology of Shield Driving through Pile Pulling and Box Culvert Areas[J].Underground Engineering and Tunnels,2011(3):23-25,56.
Authors:Zhao Jing
Abstract:Combined with the construction of the interval tunnel(Contract 2204 from Haiyue Station to Dengliang Road) of Shenzhen Metro Line 2,the paper introduces the technical difficulties and construction effect of shield driving through the pile pulling and box culvert areas.Detailed analysis is made to the technical points of pile pulling and construction monitoring process,which can be referred for the similar projects.