首页 | 本学科首页   官方微博 | 高级检索  
     

软弱围岩隧道的施工技术
引用本文:闫常清. 软弱围岩隧道的施工技术[J]. 城市道桥与防洪, 2007, 0(8): 93-96
作者姓名:闫常清
作者单位:汕头市达濠市政建设有限公司,广东汕头,516235
摘    要:随着科学技术的进步和生产管理水平的不断提高,我国修筑长大软弱围岩隧道的能力不断提高。该文以神(木)至延(安)铁路W9标隧道施工为例,阐述了软弱地质围岩地段隧道的施工方法、技术要领。文章强调地质预测和地质灾害预报的重要性,总结成功的做法,为同等条件下的施工提供借鉴。

关 键 词:软弱围岩  隧道  地质灾害  预测  施工技术
文章编号:1009-7716(2007)08-0093-04
收稿时间:2007-05-15

Construction Technique of Weak Country Rock Tunnel
Yan Changqing. Construction Technique of Weak Country Rock Tunnel[J]. Urban Roads Bridges & Flood Control, 2007, 0(8): 93-96
Authors:Yan Changqing
Affiliation:Yan Changqing
Abstract:With the progress of the science and technology and the continuous enhancement of the production management level, the ability to construct the long and large weak country rock tunnel is continuously enhanced in China. Taking the construction of Shenmu to Xi’an Railway W9 Bid Tunnel as an example, the article sets forth the construction methods and technical gist of the tunnel in the weak geological country rock area. The article emphasizes the significance of geological forecast and geological disaster forecast, and summarizes the successful procedure, which can be referred for the constructions under the same condition.
Keywords:weak country rock   tunnel   geological disaster   forecast   construction technique
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号