后张法预应力混凝土预制箱梁的施工工艺
引用本文:刘泾堂.后张法预应力混凝土预制箱梁的施工工艺[J].城市道桥与防洪,2007(9):93-95.
作者姓名:刘泾堂
作者单位:甘肃省交通规划勘察设计院有限责任公司,甘肃兰州,730030
摘    要:该文结合润扬大桥南接线J1标桥梁现场箱梁的预制过程,具体的介绍了后张法预应力混凝土预制箱梁的施工工艺,以及在施工过程中应注意的有关事项。

关 键 词:后张法  预应力混凝土预制箱梁  施工工法  注意事项
文章编号:1009-7716(2007)09-0093-03
收稿时间:2007-02-14

Construction Technology of Pre-stressed Concrete Pre-fabricated Box girder by Post-tensioning Method
Liu Jingtang.Construction Technology of Pre-stressed Concrete Pre-fabricated Box girder by Post-tensioning Method[J].Urban Roads Bridges & Flood Control,2007(9):93-95.
Authors:Liu Jingtang
Institution:Liu Jingtang
Abstract:Combined with the pre-fabrication process of the in-situ box girder of south junction J1 Bid bridge of Runyang Bridge,the article introduces in detail the construction technology of pre-stressed concrete pre-fabricated box girder by post-tensioning method and the relative points for attention in the course of construction.
Keywords:post-tensional method  pre-stressed concrete pre-fabricated box girder  construction method  points for attention  