首页 | 本学科首页   官方微博 | 高级检索  
     检索      

钢管混凝土提篮拱桥施工过程结构分析
引用本文:郭玉平.钢管混凝土提篮拱桥施工过程结构分析[J].交通科技,2011(1).
作者姓名:郭玉平
作者单位:广东省冶金建筑设计研究院,广州,510080
摘    要:以跨径112 m钢管混凝土提篮拱桥为例,采用大型有限元软件Midas civil建立空间计算模型对结构施工过程进行了有限元模拟,分析了施工过程中结构的应力和变形情况,为桥梁结构施工控制提供了依据.该桥成桥线形与设计线形吻合良好,施工控制效果显著.

关 键 词:钢管混凝土  提篮拱桥  施工过程  结构分析

Structural Analysis for Construction Process of Concrete-filled Steel Tubular X-arch Bridge
Guo Yuping.Structural Analysis for Construction Process of Concrete-filled Steel Tubular X-arch Bridge[J].Transportation Science & Technology,2011(1).
Authors:Guo Yuping
Institution:Guo Yuping(Guangdong Metallurgical and Architectural Design Institute,Guangzhou 510080,China)
Abstract:The paper take a Concrete-Filled Steel Tubular X-arch bridge with a span of 112-meters as an example and established a 3D computational model by adopting the large-scale finite element analysis software-midas civil,meanwhile made a simulation of the construction process.The paper also analyzed the stress and the distortion of the structure in the construction process and provides some reference for the control of the structural construction.The alignment of built bridge is in accord with the expectations,an...
Keywords:concrete-filled steel tubular  X-arch bridge  construction process  structural analysis  
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号