首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Dynamic Evaluation of Reliability and Stability of the Primary Support of a Tunnel北大核心CSCD
作者单位:1.Fujian Zhanglong Section of Xiarong Expressway Expansion Engineering Co. Ltd, Longyan364000;
摘    要:The evaluation of the stability of a tunnel’s primary support is a crucial component of ensuring the safety of subsequent construction. In light of the measured clearance displacements of the Wushishan Tunnel, the reliabili-ty of the primary support is evaluated dynamically and the design of the support structure is optimized. The research results show that full displacement and ultimate displacement are two main parameters for tunnel reliability analy-sis: the former can be obtained by positive and negative analysis, and the latter can be acquired by simulating a field measurement of displacement. It is not sufficient to apply the data specified in the code for railway tunnel design re-liability regarding determination of the reliability of a road tunnel structure using reliability theory, and it is neces-sary to use reliability theory to amend the standard of allowable empirical displacement in the Code of Road Tunnel Design. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.

本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号