Temperature Measurements and Tail Brush Replacement using Frozen Liquid Nitrogen for the Nanjing Weisanlu Tunnel北大核心CSCD
作者单位:1.School of Civil Engineering, Nanjing Forestry University, Nanjing210037;2.CCCC Tunnel Engineering Company Limited, Beijing100088;
摘    要:A scheme for stopping water by freezing liquid nitrogen and replacing the tail brush is presented in light of the situation encountered at the Nanjing Weisanlu river-crossing tunnel, a long-distance shield driving tunnel characterized by serious water leakage, sand gushing and water inflow at the shield tail brush. The law of the tempera-ture change of the master outlet circuits and each branch circuit when using liquid nitrogen freezing to stop water un-der high water pressures and the temperature change law for the soil body at different depths are analyzed. The re-sults show that: the temperature difference of the liquid nitrogen is large at the inlet and outlet of the freezing pipe,and it reaches around 35℃ after 6 days; the temperature drops fastest in the pebble layer, and the second fastest in the gravel sand layer, with the temperature cooling slowest in the silty fine sand layer; the average velocities at the frontal surface of the frozen soil in the pebble layer, gravel sand layer and silty fine sand layer are 15.5 cm/d, 12.5 cm/d and 8.3 cm/d, respectively, within the range 600 mm away from the frozen pipe; and affected by heat and air convection in the tunnel, the temperature at the junction of the segment and soil is higher than that in the soil layer.A complete frozen wall takes shape after 13 days of liquid nitrogen freezing, and tail brush replacement takes 22 days from freezing. © 2018, Editorial Office of "Modern Tunnelling Technology". All right reserved.

本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号