三管盾构隧道下穿铁路引起的地表位移及其控制技术
引用本文:郑余朝,仇文革,张俊儒.三管盾构隧道下穿铁路引起的地表位移及其控制技术[J].中国铁道科学,2007,28(5):65-70.
作者姓名:郑余朝  仇文革  张俊儒
作者单位:西南交通大学,土木工程学院,四川,成都,610031
基金项目:教育部高等学校博士学科点专项科研基金
摘    要:采用三维数值模拟方法,结合上海轨道交通9号线R413标段,进行三管并行盾构隧道近接下穿南新环铁路引起的地表位移及其控制技术研究。数值分析中,利用温度升降产生的膨胀和收缩效应模拟注浆压力和压力的消散,使得分析过程在力学效应上更接近盾构施工的工作状态。引入轨道高低偏差值来控制地表位移。研究结果表明:地层加固前,各隧道施工时地表的横向位移有明显的叠加效应,距离越近,效应越明显,且最大位移值已超过限值;当采用分块注浆加固地基并配合旋喷桩施工的地层位移控制技术后,地表位移得到有效的控制,现场沉降实测结果验证了控制技术的有效性,确保盾构隧道安全下穿铁路和列车的安全运营。

关 键 词:盾构隧道  下穿铁路  近接施工  地表位移  控制技术
文章编号:1001-4632(2007)05-0065-06
收稿时间:2006-12-15
修稿时间:2007-07-11

Ground Displacement Caused by Three Pipes Shield-Driven Tunnels Through below Railway on the Ground and Control Technology
ZHENG Yuchao,QIU Wenge,ZHANG Junru.Ground Displacement Caused by Three Pipes Shield-Driven Tunnels Through below Railway on the Ground and Control Technology[J].China Railway Science,2007,28(5):65-70.
Authors:ZHENG Yuchao  QIU Wenge  ZHANG Junru
Institution:School of Civil Engineering, Southwest Jiaotong University, Chengdu Siehuan 610031, China
Abstract:Research on the ground displacement caused by three pipes shield-driven tunnels through below Nanxinhuan railway on the ground and the corresponding control technology has been studied.The main method is to adopt three-dimensional numerical simulation based on R413 project of Shanghai Metro the ninth line,then compare with the in-site data to draw the conclusion.In the numerical analysis,the expansion and contraction caused by temperature increasing and decreasing is taken to simulate the scatter and disappearance of grouting pressure,which makes the analysis process closer to the working condition of shield construction in terms of mechanical effect.At the same time,two rails heights deviation is introduced to control ground displacement.Research results indicate that ground displacement caused by each pipe tunnel is added to another caused in the cross-section direction before strata being reinforced.This action is more distinct with shorter distance between two pipes tunnels,and the maximal displacement exceeds the limit.However,ground displacement is effectively controlled by using block grouting and rotary jet grouting piles.Field test results of in-situ displacement have proved the validity of the control technology,which can ensure the shield-driven tunnel safely under-cross the railway and guarantee the safe operation of trains.
Keywords:Shield-driven tunnel  Under-cross railway  Approaching construction  Ground displacement  Control technique