首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三峡工程蓄水前后水运成本比较研究
引用本文:郭,涛.三峡工程蓄水前后水运成本比较研究[J].水运工程,2012(2):25-29.
作者姓名:  
作者单位:交通运输部长江航务管理局,湖北武汉,430014
摘    要:采用对比方法,分析三峡工程蓄水前后长江中上游航道条件的变化,选取代表性船舶对蓄水前后的渝宜航线水运成本进行计算,结果表明:蓄水后水运成本和单位油耗明显降低,长江航运成本低、能耗小的比较优势得到有效发挥。建议加快三峡枢纽上下游航道治理,加快推进船型标准化,以提高三峡枢纽航运通过能力。

关 键 词:三峡工程  蓄水  水运成本

Comparative study on water transportation cost before and after impoundment of the Three Gorges project
GUO Tao.Comparative study on water transportation cost before and after impoundment of the Three Gorges project[J].Port & Waterway Engineering,2012(2):25-29.
Authors:GUO Tao
Institution:Changjiang River Administration of Shipping Affairs of MOT, Wuhan 430014, China
Abstract:By the contrastive methods, this paper analyzes the change of the channel condition in the upriver and middle reaches of the Yangtze River before and after the impoundment of the TGP, and calculates the shipping cost of the ship route from Chongqing to Yichang, based on the representative ships. It is concluded that the water transportation cost and oil consumption are decreased obviously, and it is suggested to speed up the channel regulation and ship types standardization to improve the traffic capacity of the Three Gorges project.
Keywords:Three Gorges project  impoundment  water transportation cost
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号