首页 | 本学科首页   官方微博 | 高级检索  
     

利用可控减速顶实现驼峰三部位减速器超速防护的探讨
引用本文:母正晖,周剑锋. 利用可控减速顶实现驼峰三部位减速器超速防护的探讨[J]. 铁路通信信号工程技术, 2007, 4(5): 62-64
作者姓名:母正晖  周剑锋
作者单位:北京全路通信信号研究设计院
摘    要:本文分析了编组站驼峰自动控制系统中,三部位减速器超速这一典型但又比较棘手的技术难题,提出了基于编组站驼峰自动控制系统,在三部位减速器出口后利用可控减速顶对钩车超速进行自动防护的解决方案,并阐述了该方案的合理性及可行性。

关 键 词:编组站  驼峰自动控制  速度控制  超速防护  可控减速顶
修稿时间:2007-08-23

Discussion on Over-speed Protection of Third Part Retarder by Controllable Dowty Retarder
Mu Zhenghui,Zhou Jianfeng. Discussion on Over-speed Protection of Third Part Retarder by Controllable Dowty Retarder[J]. Railway Signalling & Communication Engineering, 2007, 4(5): 62-64
Authors:Mu Zhenghui  Zhou Jianfeng
Abstract:This paper analyzes the typical technical problem about third part retarder over-speed in humping automatic control system of marshalling station, presents the solution that using controllable dowty retarder, mounted behind third part retarder, to protect cut automatically from over-speed based on automatic hump control system of marshaling station, also evaluates its reasonability and feasibility.
Keywords:Marshalling station   Automatic hump control system   Speed control   Over-speed protection   and Controllable dowty retarder
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号