首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长江口岸直水道鳗鱼沙心滩头部守护工程局部冲刷系列水槽试验研究
引用本文:曹民雄,余新民,刘兆衡,耿嘉良,王秀红.长江口岸直水道鳗鱼沙心滩头部守护工程局部冲刷系列水槽试验研究[J].水运工程,2012(1):105-110.
作者姓名:曹民雄  余新民  刘兆衡  耿嘉良  王秀红
作者单位:1. 水利部交通运输部国家能源局南京水利科学研究院,江苏南京210024;水文水资源与水利工程科学国家重点实验室,江苏南京210029
2. 长江航道规划设计研究院,湖北武汉,430011
摘    要:为维持长江口岸直水道下段目前较为有利的滩槽格局,将在鳗鱼沙心滩头部建造护滩守护工程,需要研究守护工程周边的最大冲刷深度,以确定边缘压石宽度与重点防护部位。采用1∶100与1∶200的系列水槽试验研究护滩工程周围的局部冲刷深度,试验结果表明:局部可能最大冲深6.0 m左右,结果可应用于工程设计。

关 键 词:长江口岸直水道  鳗鱼沙心滩  护滩工程  系列水槽

Local scour series of flume experiment of Manyusha shoal head protection engineering in Kou'an straight reach of the Yangtze River
CAO Min-xiong,YU Xin-min,LIU Zhao-heng,GENG Jia-liang,WANG Xiu-hong.Local scour series of flume experiment of Manyusha shoal head protection engineering in Kou'an straight reach of the Yangtze River[J].Port & Waterway Engineering,2012(1):105-110.
Authors:CAO Min-xiong  YU Xin-min  LIU Zhao-heng  GENG Jia-liang  WANG Xiu-hong
Institution:1. Nanjing hydraulic Research Institute, Nanjing 210024, China; 2. State Key Laboratory of Hydrology-Water Resources and HydraulicEngineering, Nanjing 210029, China; 3. Changjiang Waterway Planning, Design and Research Institute, Wuhan 430011, China
Abstract:In order to maintain a more favorable pattern of beach slot at present in Kou’an straight reach of the Yangtze River,Manyusha shoal head protection engineering will be implemented,thus the maximum scour depth surrounding the project need to be studied to determine the width of pressure stone in edge and the key protection parts.The flume series experiments with the scale of 1∶100 and 1∶200 are used to study the local scour depth around beach protection project.The result shows that the depth of maximum local scour will be 6.0 m,which can be applied to the engineering design.
Keywords:Kou’an straight reach of Yangtze River  Manyusha shoal  beach protection engineering  series of flume
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号