摘    要:以三峡左岸电站500kV输电线路杆塔桩基础静载试验工程为实例,介绍单桩垂直静载抗压试验、单桩垂直静载抗拔试验、单桩水平静载抗推试验,供同类工程参考。

关 键 词:桩基础  静载试验  承载力
文章编号:1003-4722(2006)S1-0131-03
收稿时间:2006-03-08
修稿时间:2006-03-08

Static Load Tests for Pile Foundations of 500 kV Transmission Line Towers of Left Bank Power Station, Three Gorges Dam
GONG De-ping.Static Load Tests for Pile Foundations of 500 kV Transmission Line Towers of Left Bank Power Station, Three Gorges Dam[J].Bridge Construction,2006(A01):131-133,139.
Authors:GONG De-ping
Institution:The 3rd Engineering Co., Ltd., China Zhongtie Major Bridge Engineering Group, Guangzhou 510800, China
Abstract:By way of examples of the static load tests for pile foundations of 500 kV transmission line towers of Left Bank Power Station, Three Gorges Dam, this paper gives an account of the single pile compression test and pull test under vertical static load, and the single pile push test under horizontal static load to provide reference for the tests for similar foundation works.
Keywords:pile foundation  static load test  carrying capacity