首页 | 本学科首页   官方微博 | 高级检索  
     检索      

广东中山临海工业园防潮防洪及竖向设计探讨
引用本文:钱光.广东中山临海工业园防潮防洪及竖向设计探讨[J].城市道桥与防洪,2005(5):86-87.
作者姓名:钱光
作者单位:广东省中山市规划设计院,广东,中山,528400
摘    要:广东中山临海工业园为国家火炬计划临海装备制造产业基地,其东、西、北三面临靠横门水道,南望珠江入海口,面积约20km2。该文介绍该基地的规划原则、防潮防洪体系的标准和确定以及设计水位和堤顶高程的计算。

关 键 词:城市规划  竖向设计  防潮防洪  堤顶高程  中山市  工业园区
文章编号:1009-7716(2005)02-0086-02
收稿时间:2005-02-04
修稿时间:2005年2月4日

Approach to Damp-Proof and Flood Control and Vertical Design of Zhongshan Linhai Industrial Park in Guangdong Province
QIAN Guang.Approach to Damp-Proof and Flood Control and Vertical Design of Zhongshan Linhai Industrial Park in Guangdong Province[J].Urban Roads Bridges & Flood Control,2005(5):86-87.
Authors:QIAN Guang
Abstract:Zhongshan Linhai Industrial Park in Guangdong Province is the base of Linhai equipment manufacture industry of the state torch plan. It faces on Hengmen Watercourse in three directions, i.e. east, west and north. It also gazes out at entrance into the sea of the Zhujiang River in south with an area of 20km2. The paper introduces the planning principle of the base, the standards and determination of damp-proof and flood control system as well as the calculation of the design level and embankment top elevation.
Keywords:urban planning  vertical design  damp-proof and flood control  embankment top elevation  Zhongshan City  industrial park area  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号