首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高地应力岩爆对TBM施工的影响及对策
引用本文:罗汝洲.高地应力岩爆对TBM施工的影响及对策[J].铁道建筑技术,2009(9):103-105,109.
作者姓名:罗汝洲
作者单位:中铁十三局集团有限公司,长春,130033
摘    要:锦屏二级水电站引水隧洞工程埋深大,地应力高,在采用TBM法施工中碰到了高地应力导致的岩爆问题,对施工进度、设备和人员安全影响较大。总结TBM施工过程中岩爆发生规律,通过各种支护形式的现场试验,对防止岩爆的主要对策进行了探索。

关 键 词:高地应力  岩爆  TBM  对策

The Influence of High Geo-stress Rock Burst on TBM Construction and its Countermeasures
Luo Ruzhou.The Influence of High Geo-stress Rock Burst on TBM Construction and its Countermeasures[J].Railway Construction Technology,2009(9):103-105,109.
Authors:Luo Ruzhou
Institution:Luo Ruzhou (China Railway 13^th Bureau Group Co. Ltd. , Changchun 130033, China)
Abstract:The burying depth of JinPing secondary hydroelectric station is deep and the geo-stress is high. In the execution of TBM, rock explosion, caused by high geostress, arose, which had a huge influence on the construction schedule, equipment and staff. The paper summarizes the pattern of rock burst in the execution of TBM and explores the pattern as well. On the basis of experiments with different forms of support, preliminary knowledge of major burst is obtained.
Keywords:TBM
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号