首页 | 本学科首页   官方微博 | 高级检索  
     

高速公路填石路堤施工工艺
引用本文:涂祥进,凌伟. 高速公路填石路堤施工工艺[J]. 筑路机械与施工机械化, 2009, 26(7): 48-49
作者姓名:涂祥进  凌伟
作者单位:江苏省南京市路桥工程总公司,江苏,南京,210046
摘    要:针对由于填料粒径大、颗粒不均匀而给填石路基的质量检测带来较大困难的情况.结合南京绕越高速公路东南段工程施工,对填石路基的特点、施工方法、检测控制进行阐述,通过对试验数据的统计和分析表明。用沉降差检测配合外观检查的双控方法,可实现对填石路堤压实质量的有效控制。

关 键 词:填石路堤  施工工艺  质量检测  沉降差

Construction Technology of Expressway Rock-fill Embankment
TU Xiang-jin,LING Wei. Construction Technology of Expressway Rock-fill Embankment[J]. Road Machinery & Construction Mechanization, 2009, 26(7): 48-49
Authors:TU Xiang-jin  LING Wei
Affiliation:(Nanjing Road and Bridge Engineering Corporation, Nanjing 210046, Jiangsu, China)
Abstract:Particle-size of rock-fill is big and nonuniform, which brings difficulties to quality testing of rock-fill embankment. So in combination with the construction of the south-east section of Nanjing more surrounding expressway, the characteristic, construction method and checking control of rock-fill embankment are expounded. Statistical analysis of experiment shows that compaction quality of rock-fill embankment can be effectively controlled by appearance checking and settlement difference testing.
Keywords:rock-fill embankment  construction technology  quality testing  settlement difference
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号