首页 | 本学科首页   官方微博 | 高级检索  
     检索      

某航站楼曲面网架基于不同施工顺序的施工过程分析比较
引用本文:任金岭.某航站楼曲面网架基于不同施工顺序的施工过程分析比较[J].铁道建筑技术,2014(10):126-128.
作者姓名:任金岭
作者单位:中铁十八局集团建筑安装工程有限公司,天津300308
摘    要:某航站楼在复杂曲面网架施工时依照不同的施工顺序提出了3种施工方案,采用有限元软件Midas对不同方案进行施工过程计算分析,比较不同方案的应力和变形结果,并与静力分析模型结果进行比较,表明了合理的施工方案及施工过程分析的重要性。

关 键 词:曲面网架  施工过程分析  施工顺序

Construction Process Simulation and Comparison of the Surface Steel Grid Structure of an Airport Under Various Construction Sequences
Ren Jinling.Construction Process Simulation and Comparison of the Surface Steel Grid Structure of an Airport Under Various Construction Sequences[J].Railway Construction Technology,2014(10):126-128.
Authors:Ren Jinling
Institution:Ren Jinling ( China Railway 18th Bureau Group Co. Ltd. , Tianjin 300308, China)
Abstract:Three different construction schemes are proposed during the construction of the complex surface steel grid struc- ture of an airport terminal. Finite element analysis software Midas is adopted for the different construction process simula- tion. The stress and displacement results of different construction schemes are gained, analyzed and compared. The con- struction process results are compared with the result of static analysis model which shows the importance of reasonable con- struction scheme and construction process.
Keywords:complex surface grid structure  construction process analysis  construction sequence
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号