首页 | 本学科首页   官方微博 | 高级检索  
     

浅埋暗挖车站施工地表沉降实测分析
引用本文:骆建军,张顶立,王梦恕,张成平. 浅埋暗挖车站施工地表沉降实测分析[J]. 铁道建筑技术, 2006, 0(3): 1-4
作者姓名:骆建军  张顶立  王梦恕  张成平
作者单位:北京交通大学隧道及地下工程试验研究中心,北京,100044
摘    要:以北京地铁四号、十号线黄庄站工程为背景,结合现场施工量测结果,阐述了四号线在浅埋暗挖法施工条件下地表沉降产生的原因及沉降规律,分析了影响地表沉降的因素,并提出控制沉降的措施。

关 键 词:地铁  浅埋暗挖车站  地表沉降  监控量测
文章编号:1009-4539(2006)03-0001-04
修稿时间:2005-12-15

Study on the Measure of Ground Subsidence in Constructionsite for Subway Station Mined in Shallow Stratum
Luo Jianjun,Zhang Dingli,Wang Mengshu,Zhang Chengping. Study on the Measure of Ground Subsidence in Constructionsite for Subway Station Mined in Shallow Stratum[J]. Railway Construction Technology, 2006, 0(3): 1-4
Authors:Luo Jianjun  Zhang Dingli  Wang Mengshu  Zhang Chengping
Abstract:On the basis of engineering for Huangzhuang Station of Line No.4 and Line No.10 of Beijing Subway,by combining the analysis of the site monitoring measurement results,this thesis depicts the reasons and regularity of the ground subsidence induced by the method of a developed NATM in shallow and soft ground tunnel,analyses the influencing factors of the ground subsidence and puts forward relevant control measures.
Keywords:subway  subway station mined in shallow stratum  ground subsidence  site monitoring measurement  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号