首页 | 本学科首页   官方微博 | 高级检索  
     

丹阳北二环大桥斜拉索施工技术
引用本文:王毅. 丹阳北二环大桥斜拉索施工技术[J]. 铁道建筑技术, 2010, 0(12): 4-5
作者姓名:王毅
作者单位:中机十院国际工程有限公司,河南洛阳471600
摘    要:在丹阳北二环大桥斜拉索施工中,总结多座跨径小于150m的斜拉桥斜拉索施工技术,针对此前大型斜拉索施工技术进行了优化改进,特别是斜拉索的展索、挂索及张拉技术。

关 键 词:斜拉索  展索  挂索  张拉

Construction Technology of Stay Cables in Danyang North Second Ring Road Bridge
Wang Yi. Construction Technology of Stay Cables in Danyang North Second Ring Road Bridge[J]. Railway Construction Technology, 2010, 0(12): 4-5
Authors:Wang Yi
Affiliation:Wang Yi China Machinery TDI InternationaI Engineering Co.Ltd.,Luoyang 471600,china
Abstract:In the stay cable construction of Danyang North Second Ring Road Bridge,it is summarized the stay cable construction technology of several cable-stay bridges whose sparts are shotter than 150 meters,and optimized the stay cable construction technology of the large cable-stayed bridges,especially the uncoiling,hanging and tensioning of stay cables.
Keywords:stay cable  untoil the stay cable  hang the stay cable  tension
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号